Port Blair, June 27: In a letter to the Deputy Commissioner, South Andaman the Executive Engineer, SAD, APWD has informed that the construction of culvert at Dairy Farm Junction is over. The road above the culvert is prepared and ready for allowing the light motor vehicles, till the laying of final layer of the road surface for settlement of the earth embankment.
Dairy Farm Culvert Ready for Light Vehicle Movement
- Details
- Denis Giles