Project Worth Rs. 9.97 Crore Expected to Complete in 6-8 Months

Port Blair, Oct. 12: The work of Marina Road Restructuring under the proposed Smart City project of construction of Marine Esplanade commenced today at Marina Park in the presence of CEO, Port Blair Smart Projects Limited and other officials.  The length of the road to be restructured is 1.495 kms from flag point to the end of Marina Park. The project cost is Rs. 9.97 Cr and is likely to be completed in six to eight months period.

This is a part of one of the signature projects in Port Blair under Smart City Mission aimed at improving the leisure spaces for citizens and exhilarating sea front. The entire coastal stretch shall be developed. Its first phase covers the restructuring of coastal road from Marina Park to Flag Mast, which was initiated today. The road will be developed as a signature road in Port Blair with exclusive walking track, sitting deck/street furniture with landscaping and lighting.