Port Blair, May 16: The general public and consumers of the Department of Electricity have been informed that shifting/removal of 33 KV underground power cables at Bambooflat Sub-Station will be carried out on May 18, 2024. During the work, there will be power interruptions in some areas of Port Blair and the South Andaman on an as-and-when required basis from 7 am to 12 noon and power supply will remain completely shut-down from Bambooflat to Wimberlygunj areas between 7 am and 12 noon. This outage is necessary to facilitate the shifting/removal of 33 KV underground cables from the yard at the Bambooflat Sub-Station.