It is to inform to all general public that, the deck slab of the bridge at Km 88.300 (B.D. Nallah) within the Jarwa Reserve Areas has got damaged on Left Hand Side (from JPP Jirkatang). Consequently, the left carriageway has been barricaded and the traffic has been diverted to the Right Hand Side (Half Carriageway) of the Bridge. Now, some cracks have also been noticed on the Right Hand Side deck slab of the bridge (from JPP Jirkatang).

 In order to ensure the safety of the road user and to prevent any potential incident, following precautions need to be taken with respect to all the vehicles crossing the bridge:

  1. Vehicle weight is restricted to 20 MT per vehicle.
  2. a) All heavy vehicles carrying construction materials/goods shall restrict to carry only 7-8 cbm load (excluding 10 MT weight of unloaded truck).
  3. b) All oil tankers/LPG Cylinder carrying vehicles shall restrict to carry only 7-8 cbm load (excluding 10 MT weight of unloaded truck).
  4. Vehicle speed is limited to 10 Km/hrs.

Only one vehicle is allowed to cross the Bridge at a time.