Port Blair, Jan 13: The road from Dollygunj Jn. to DBRAIT will be closed for all the vehicle movements for 04 days w.e.f 14.01.2023 to 17.01.2023. Hence, all the vehicles will be diverted through adjacent road i.e. ICMR to Bhathubasti Water Treatment Unit Road.